Ski Resorts News
09/29/2022
On the occasion of the 10th anniversary of Ski Juwel Alpbachtal Wildschönau, the starting signal is given by the Alpbacher Bergbahn for the new construction of the new chairlift in Alpbach. Modern 6-seater chairlift replaces 4-seater chairlift

After 23 years, 16,567 operating hours and 7,129,813 people transported, the Hornlift 2000 has reached the end of its service life. Originally, the projekt was planned to start in 2020. However, the corona-related break was used for careful planning and preparation of the investment.
The Ski Juwel Alpbachtal Wildschönau ski resort has treated itself to a few presents to mark its 10th birthday. The Hornlift 2000 will be replaced by a heated six-person chairlift with a pull-down plastic bubble to protect passengers from bad weather. This new lift will transport skiers and snowboarders up to the highest point in the ski resort in just 3 minutes and 45 seconds.
Up at the top you will find a state-of-the-art lift station including a viewing tower with the grand name Top of Alpbachtal. The new top station promises to be an absolute highlight. Named "Top of Alpbachtal" it provides an observation tower with new premises as well as a viewing platform with a unique panoramic view. The station and tower have been designed by the internationally renowned architects Snøhetta.

Facts Hornbahn 2000
Type of lift: 6-seater chairlift with weather protection bonnet & heated seats
Speed: 5 m/s
Altitude of the bottom station: 1,638 m
Altitude of the top station: 2,030 m
Difference in altitude: 391,00 m
Length: 1.123,11 m
Length of the trip: 3 min 45 sec
Number of pillars: 11 pillars
Number of seats: 61 seats
Capacity: 2,600 persons per hour
Investment: approx. € 10,5 million
Manufacturer: Leitner GmbH
Architect / Planning: Snøhetta, Innsbruck
Start of construction: June 2022
Completion: Start of winter season 2022/23
Speed: 5 m/s
Altitude of the bottom station: 1,638 m
Altitude of the top station: 2,030 m
Difference in altitude: 391,00 m
Length: 1.123,11 m
Length of the trip: 3 min 45 sec
Number of pillars: 11 pillars
Number of seats: 61 seats
Capacity: 2,600 persons per hour
Investment: approx. € 10,5 million
Manufacturer: Leitner GmbH
Architect / Planning: Snøhetta, Innsbruck
Start of construction: June 2022
Completion: Start of winter season 2022/23
Latest Resort News

New 8 seater Limberg chairlift in Saalbach
Saalbach-Hinterglemm again invests to ensure even more comfort for all winter sport fans. After 29 years and over 15 million guests, Saalbach Limberg 4-seater is being retired and will be replaced by a modern 8-seater chairlift.
09/27/2023

Zillertal Arena: new Wilde Krimml gondola lift & Mitterleger chairlift
The Krimml-X-Press connecting cable car will transport guests quickly and safely directly between Zell and Gerlos as a 10-seater gondola with high stability against the wind and no stops.
09/23/2023

Gitschberg-Jochtal-Plose skipass prices
Brixen-Plose prices for ski season 2023/2024. The ski pass ‘Rio Pusteria Bressanone’ gives you access to five ski areas in and around Bressanone. These include: Mount Plose, Gitschberg-Val Giovo, Luson, Velturno and Funes.
09/19/2023