02/07/2017
New Oberholz alpine hut 2,096 meters above sea-level. Opening on November 26, 2016
At the Oberholz lift in Obereggen, a new mountain restaurant with a panorama terrace on the sunlit side that fits perfectly into the natural landscape is now under construction. Additionally, a nice bar is also planned where skiers and hikers can stop by for a refreshment or a snack the whole day through. An ideal place with a cozy atmosphere where guests can relax and refresh themselves. The new hut also offers shelter in the event of bad weather, and a WC at the chairlift's mountain station. The project – characterized by a modern design, sustainability, and a free apportioning of space – comes from the drawing board of the architectural team of Peter Pichler and Pavol Mikolajcak.
New Laner Combi-Lift (chairlift + gondolas) and new Absam tobogganing course. Opening on November 26, 2016
The existent 4-seat Laner chairlift will be replaced in the coming season by a modern combi-lift. A new 750-meter-long tobogganing course extending from the Epircher Laner Alm to the valley station of the Absam-Maierl Lift is also being prepared. The new lift is equipped with 6-seat chairs and 8-passenger gondolas and offers skiers and tobogganers an even more-comfortable and rapid trip. Furthermore, the Laner slope is being widened and improved.
Latest Resort News

Garaventa builds one of Switzerland’s biggest chairlifts in Villars resort
The fourth 8-seater chairlift in Switzerland went into service at the beginning of December 2022 in the Villars-Gryon-Diablerets ski area. The new ropeway means a significant increase in capacity for the trip from Villars to Les Diablerets.
03/16/2023

What's new for winter 2023 in Les 2 Alpes
SATA, the lift company that has been managing the Les 2 Alpes lift system since December 2020, keeps improving the ski area to improve the access, the comfort and the flow for skiers across the area.
01/07/2023